Executive design and execution of a crossbar over Rio Salso Stream
Using Rio Salso Stream basin flows as a water resource in irrigating the area on […]
Morphological restoration operations for the environmental and hydrogeological requalification of the Val di Brenta area
In order to retain sediments in the lagoon, to avoid spreading […]
Executive design, construction and operation of waste treatment and utilization plant, in Arborea
The contract stipulated designing, building, and managing the municipal solid waste (SUW) sorting […]
Executive design and construction of mechanical and biological treatment plant in Bellolampo (PA)
The contract required the executive design and construction of a 24,000 sq m […]
Securing and depolluting the Port of Brindisi’s Seno di Ponente area
The port of Brindisi is both an area at high environmental risk and a Site […]
Securing the Botte delle Trezze beneath the Bacchiglione River
Built in the 19th century, the Botte delle Trezze siphon vault passes beneath the Bacchiglione and Brenta […]
Executive design and construction of mechanical and biological waste treatment plant, Enna
The contract required designing, building, and managing the municipal solid waste sorting and treatment […]
Vittadello Group has been working on the reclamation of the “Collina” area at the Mantua petrochemical plant since 2014. Now that the first phase of […]