Skip to content
Vittadello Logo Vittadello Logo Vittadello Logo
  • Works completed
    • Building
    • Environmental protection
    • Hydraulic infrastructure
    • Infrastructure and transport
    • Maritime works
    • Renewable energy
    • Restoration
  • Who we are
  • Sustainability and certification
  • News
  • Contacts
    • Contacts
    • Work with us
  • English
    • Italiano
  • Works completed
    • Building
    • Environmental protection
    • Hydraulic infrastructure
    • Infrastructure and transport
    • Maritime works
    • Renewable energy
    • Restoration
  • Who we are
  • Sustainability and certification
  • News
  • Contacts
    • Contacts
    • Work with us
  • English
    • Italiano

Hydraulic reclamation

Hydraulic reclamation

Drought and extreme weather events can heavily affect the morphology and population. For this reason, it is necessary to protect and improve hydrogeological risk areas with works such as rolling basins, embankments, reservoirs and expansion tanks. Since its foundation, Vittadello Group has successfully operated in this field with morphological restoration for the environmental and hydrodynamic redevelopment of a complex and extraordinarily delicate area such as Venice and Laguna Veneta.

Hydraulic arrangements by Vittadello
  1. Environmental protection
  2. Hydraulic reclamation
  • Traversa torrente Rio Salso

    Crossbar over Rio Salso stream, Candela (FG)

    Categories: Hydraulic reclamation

    Executive design and execution of a crossbar over Rio Salso Stream

    Using Rio Salso Stream basin flows as a water resource in irrigating the area on […]

  • Riqualificazione idrodinamica Val di Brenta

    Val di Brenta area, Chioggia (VE)

    Categories: Hydraulic reclamation

    Morphological restoration operations for the environmental and hydrogeological requalification of the Val di Brenta area

    In order to retain sediments in the lagoon, to avoid spreading […]

  • Botte delle Trezze sottopassante il fiume Bachiglione

    Botte delle Trezze underpassing the Bacchiglione river

    Categories: Hydraulic reclamation, Maritime works

    Securing the Botte delle Trezze beneath the Bacchiglione River

    Built in the 19th century, the Botte delle Trezze siphon vault passes beneath the Bacchiglione and Brenta […]

  • Restoration of Barene Valle Millecampi Venice

    The Millecampi Lagoon reclamation project OP/287

    Categories: Hydraulic reclamation

    The Millecampi marshland occupies a large part of the southwestern Venice Lagoon included between the south Brenta drainage area, the Morosina and Ghebo Storto fish […]

Vittadello Logo

Vittadello Spa
Via L. Pierobon, 46
35010 Limena (PD)
C.F.- P.I. 05294220289
R.E.A. 457913
C.C.I.A.A. PD – R.I. 05294220289

Contacts >>

Works completed

  • Building
  • Environmental protection
  • Renewable energy
  • Hydraulic infrastructure
  • Infrastructure and transport
  • Maritime works
  • Restoration

Discover

  • Sustainability and certification
  • News
  • Contacts
  • Work with us

FOLLOW US ON

© Copyright | All Rights Reserved | Powered by WorldAppeal | Privacy Policy | Cookie Policy

Page load link
Go to Top