{"id":23590,"date":"2025-01-23T17:54:41","date_gmt":"2025-01-23T16:54:41","guid":{"rendered":"https:\/\/vittadello.net\/?post_type=avada_portfolio&#038;p=23590"},"modified":"2025-01-23T18:39:44","modified_gmt":"2025-01-23T17:39:44","slug":"grosseto-fano-e78-highway-network","status":"publish","type":"avada_portfolio","link":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/","title":{"rendered":"Grosseto Fano E78 highway network"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1420.64px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_3 1_3 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:33.333333333333%;--awb-margin-top-large:0px;--awb-spacing-right-large:5.76%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:5.76%;--awb-width-medium:33.333333333333%;--awb-order-medium:0;--awb-spacing-right-medium:5.76%;--awb-spacing-left-medium:5.76%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p><strong>Executive design and execution of works for the Grosseto-Fano E78 highway network<\/strong><\/p>\n<p>The Grosseto-Fano E78 highway network is one of the most important east-west connections between roads running north-south along between the Tyrrhenian and Adriatic coasts. The network begins on Via Aurelia in Grosseto and ends on the Adriatica A14 Autostrada near the Fano tollbooth in the Marche Region. Operations widened the roadbed to 4 lanes in the section of the E78 highway between Grosseto and Siena from Km 30+040 and from Km 41 +600 on the Paganico State Road No. 223 in the towns of Monticiano (Province of Siena) and Civitella Paganico (Province of Grosseto) for a total length of approx. 11.50 km.<br \/>\nThe most significant roadworks included the five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.<\/p>\n<p><em><strong>Location:<\/strong> Grosseto (GR)<br \/>\n<\/em><em><strong>Function:<\/strong> Construction of State Road<br \/>\n<\/em><em><strong>Client:<\/strong>\u00a0ANAS S.p.A.<br \/>\n<\/em><strong><em>Contract value:<\/em><\/strong><em>245.5 million euros<\/em><em><br \/>\n<\/em><strong><em>Completion: <\/em><\/strong>2021<em><br \/>\n<\/em><strong><em>Highlights:\u00a0<\/em><\/strong>The Farma viaduct 792 m long deck consists of a mixed steel-concrete section continuous beam with over 14 spans varying from 30 to 114 m length (along the Farma stream bed). The piers in the bed reach heights of 70 to 95 m.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.88%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:2.88%;--awb-width-medium:66.666666666667%;--awb-order-medium:0;--awb-spacing-right-medium:2.88%;--awb-spacing-left-medium:2.88%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"awb-gallery-wrapper awb-gallery-wrapper-1 button-span-no\" style=\"--more-btn-alignment:center;\"><div style=\"margin:-5px;--awb-bordersize:0px;\" class=\"fusion-gallery fusion-gallery-container fusion-grid-2 fusion-columns-total-2 fusion-gallery-layout-grid fusion-gallery-1\"><div style=\"padding:5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-none\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img fetchpriority=\"high\" fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto-460x295.jpg\" width=\"460\" height=\"295\" alt=\"Adeguamento itinerario E78 Grosseto\" title=\"Adeguamento itinerario E78 Grosseto\" aria-label=\"Adeguamento itinerario E78 Grosseto\" class=\"img-responsive wp-image-23593 fusion-gallery-image-size-fixed\"  \/><\/a><\/div><\/div><div style=\"padding:5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-none\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Lavori-itinerario-E78-Grosseto.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Lavori-itinerario-E78-Grosseto-460x295.jpg\" width=\"460\" height=\"295\" alt=\"Lavori itinerario E78 Grosseto\" title=\"Lavori itinerario E78 Grosseto\" aria-label=\"Lavori itinerario E78 Grosseto\" class=\"img-responsive wp-image-23597 fusion-gallery-image-size-fixed\"  \/><\/a><\/div><\/div><div class=\"clearfix\"><\/div><\/div><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:25px;margin-bottom:25px;width:100%;\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":13,"featured_media":23593,"menu_order":0,"template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[65],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-23590","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-roads-tunnels-viaducts-and-railways"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grosseto Fano E78 highway network - Vittadello<\/title>\n<meta name=\"description\" content=\"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grosseto Fano E78 highway network - Vittadello\" \/>\n<meta property=\"og:description\" content=\"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/\" \/>\n<meta property=\"og:site_name\" content=\"Vittadello\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/gruppovittadello\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T17:39:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/\",\"url\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/\",\"name\":\"Grosseto Fano E78 highway network - Vittadello\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vittadello.net\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Adeguamento-itinerario-E78-Grosseto.jpg\",\"datePublished\":\"2025-01-23T16:54:41+00:00\",\"dateModified\":\"2025-01-23T17:39:44+00:00\",\"description\":\"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/#primaryimage\",\"url\":\"https:\\\/\\\/vittadello.net\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Adeguamento-itinerario-E78-Grosseto.jpg\",\"contentUrl\":\"https:\\\/\\\/vittadello.net\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Adeguamento-itinerario-E78-Grosseto.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Adeguamento itinerario E78 Grosseto\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/grosseto-fano-e78-highway-network\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/vittadello.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Opere\",\"item\":\"https:\\\/\\\/vittadello.net\\\/en\\\/completed-works\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Infrastructure and transport\",\"item\":\"https:\\\/\\\/vittadello.net\\\/en\\\/categories-works-completed\\\/infrastructure-and-transport\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Roads, tunnels, viaducts and railways\",\"item\":\"https:\\\/\\\/vittadello.net\\\/en\\\/categories-works-completed\\\/roads-tunnels-viaducts-and-railways\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Grosseto Fano E78 highway network\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/vittadello.net\\\/en\\\/\",\"name\":\"Vittadello\",\"description\":\"Strade, Gallerie, Viadotti, Edilizia, Energie rinnovabili, discariche e impianti trattamento rifiuti, Bonifiche ambientali\",\"publisher\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vittadello.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#organization\",\"name\":\"Vittadello Spa\",\"url\":\"https:\\\/\\\/vittadello.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/vittadello.net\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Vittadello-Logo-500.png\",\"contentUrl\":\"https:\\\/\\\/vittadello.net\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Vittadello-Logo-500.png\",\"width\":500,\"height\":125,\"caption\":\"Vittadello Spa\"},\"image\":{\"@id\":\"https:\\\/\\\/vittadello.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/gruppovittadello\",\"https:\\\/\\\/www.instagram.com\\\/gruppovittadello\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/intercantieri-vittadello-spa\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grosseto Fano E78 highway network - Vittadello","description":"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/","og_locale":"en_US","og_type":"article","og_title":"Grosseto Fano E78 highway network - Vittadello","og_description":"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.","og_url":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/","og_site_name":"Vittadello","article_publisher":"https:\/\/www.facebook.com\/gruppovittadello","article_modified_time":"2025-01-23T17:39:44+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/","url":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/","name":"Grosseto Fano E78 highway network - Vittadello","isPartOf":{"@id":"https:\/\/vittadello.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/#primaryimage"},"image":{"@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/#primaryimage"},"thumbnailUrl":"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg","datePublished":"2025-01-23T16:54:41+00:00","dateModified":"2025-01-23T17:39:44+00:00","description":"Five newly-constructed viaducts, three bore tunnels, nine trench tunnels and the upgrading of the 4 existing viaducts.","breadcrumb":{"@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/#primaryimage","url":"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg","contentUrl":"https:\/\/vittadello.net\/wp-content\/uploads\/2025\/01\/Adeguamento-itinerario-E78-Grosseto.jpg","width":1920,"height":1080,"caption":"Adeguamento itinerario E78 Grosseto"},{"@type":"BreadcrumbList","@id":"https:\/\/vittadello.net\/en\/completed-works\/grosseto-fano-e78-highway-network\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/vittadello.net\/en\/"},{"@type":"ListItem","position":2,"name":"Opere","item":"https:\/\/vittadello.net\/en\/completed-works\/"},{"@type":"ListItem","position":3,"name":"Infrastructure and transport","item":"https:\/\/vittadello.net\/en\/categories-works-completed\/infrastructure-and-transport\/"},{"@type":"ListItem","position":4,"name":"Roads, tunnels, viaducts and railways","item":"https:\/\/vittadello.net\/en\/categories-works-completed\/roads-tunnels-viaducts-and-railways\/"},{"@type":"ListItem","position":5,"name":"Grosseto Fano E78 highway network"}]},{"@type":"WebSite","@id":"https:\/\/vittadello.net\/en\/#website","url":"https:\/\/vittadello.net\/en\/","name":"Vittadello","description":"Strade, Gallerie, Viadotti, Edilizia, Energie rinnovabili, discariche e impianti trattamento rifiuti, Bonifiche ambientali","publisher":{"@id":"https:\/\/vittadello.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vittadello.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/vittadello.net\/en\/#organization","name":"Vittadello Spa","url":"https:\/\/vittadello.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vittadello.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/vittadello.net\/wp-content\/uploads\/2023\/01\/Vittadello-Logo-500.png","contentUrl":"https:\/\/vittadello.net\/wp-content\/uploads\/2023\/01\/Vittadello-Logo-500.png","width":500,"height":125,"caption":"Vittadello Spa"},"image":{"@id":"https:\/\/vittadello.net\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/gruppovittadello","https:\/\/www.instagram.com\/gruppovittadello\/","https:\/\/www.linkedin.com\/company\/intercantieri-vittadello-spa"]}]}},"_links":{"self":[{"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/23590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/users\/13"}],"version-history":[{"count":6,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/23590\/revisions"}],"predecessor-version":[{"id":23621,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/23590\/revisions\/23621"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/media\/23593"}],"wp:attachment":[{"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/media?parent=23590"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/portfolio_category?post=23590"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/portfolio_skills?post=23590"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/vittadello.net\/en\/wp-json\/wp\/v2\/portfolio_tags?post=23590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}